Customization: | Available |
---|---|
Certification: | ISO, CE |
Color: | Black |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | index | ||
H | L | P | |
mm≥ The resin thickness of Middle fabric |
- | 0.40 | |
N/cm ≥ Maximum tension N/cm ≥ |
- | 200 | 250 |
MPa≥ Tension strength Mpa≥ |
12 | - | - |
%≥ Maximum tension elongation |
- | 15 | |
%≥ Fracture elongation |
500 | 250 | - |
%≤ Heat treatment size change rate |
2.0 | 1.0 | 0.5 |
Low-temperature bending |
-40ºC -40ºCNo craze |
No | item | index | |
1 | Peel strength/(N/mm) | Coil and Coil | ≥1.0 |
Coil and aluminum | ≥1.5 | ||
2 | Peel strength after immersion/(N/mm) | ≥1.5 | |
3 | The peel strength after heat aging /(N/mm) | ≥1.5 | |
4 | Self - adhesive surface heat resistance | 70ºC,2h No flow | |
5 | Sticky /min | ≥15 |
1.When casting concrete, the concrete mortar and material are combined to form a special macro molecular polymer to make curing reaction adhering, so that coiled material structure is adhered together permanently. No water fleeing inside the structure, and increase the reliability of waterproof layer
2.It has strong self-healing ability and can repair slight construction injury.
3.High strength of elongation, strong breaking tensile strength and good anti-perforation performance .
4..With strong chemical resistance to acid and alkali
5.Integration of self adhesion, waterproof and protection, so that can reduce construction links
6.Wet method construction, no need flat layer, low requirement for the base, not affected by weather and base moisture, it has obvious advantage of constructions in rainy season.
7.The floor board of the building should be constructed with a pre-applied anti-sticking method. This method no need protective layer.
8. one layer can reach level one waterproofing security requirements